Europe: +33 2 33 61 16 70 | America: +1 438 800 6104

Ventilation bar for transformers 400/600/800/1200/1800/3600

Delivery in 3 to 5 weeks

The forced ventilation system allows the transformer to maintain an optimal temperature, increasing its safety, even in the event of higher temporary loads. 
The installation of the fans at the edge of the machine is facilitated by the aluminum bar which guarantees an easy and fast assembly (for application techniques, please consult the manuals).

306.07KB Download

Technical sheet 400/600/800 | Ventilation bar for transformers 400 / 600 / 800 / 1200 / 1800 / 3600

437.71KB Download

Manual 400/600/800 | Ventilation bar for transformers 400 / 600 / 800 / 1200 / 1800 / 3600

252.7KB Download

Data sheet 1200/1800/3600 | Ventilation bar for transformers 400 / 600 / 800 / 1200 / 1800 / 3600

579.26KB Download

Manual 1200/1800/3600 | Ventilation bar for transformers 400 / 600 / 800 / 1200 / 1800 / 3600

Product features Ventilation bar for transformers 400/600/800/1200/1800/3600

Ventilation of dry transformers and oil bath

These products can interest you

Delivery in 3 to 5 weeks
NT935WS

NT935WS

Free of any wiring thanks to the certified 2,4 GHz WiFi interface, the NEW WS LINE makes the installation even more ...
Delivery in 3 to 5 weeks
T412 controller

T412 controller

APPLICATION Single input unit with electronic microcontroller, which can be mounted on any ...
Delivery in 3 to 5 weeks
NT511AD controller

NT511AD controller

APPLICATION The NT511 is a combined unit to control the temperature of dry transformers and the power ...
Delivery in 3 to 5 weeks
T512 RS485 controller

T512 RS485 controller

The new "intelligent multichannel" UNIT T512, mainly oriented towards engine temperature control, ...
Delivery in 3 to 5 weeks
NT935 controller

NT935-IR + TIR409 controller

APPLICATION The NT935-IR control unit coupled with dedicated TIR409 infrared sensors allows the control of the t ...
Delivery in 3 to 5 weeks
MM453 AD controller

MM453 AD controller

APPLICATION Suitable for temperature control of diesel generators and biogas, it is also designed ...
Delivery in 3 to 5 weeks
T154WS

T154WS

Main features: Maintain the same electrical and operating specifications of the T154 model. Co...
Delivery in 3 to 5 weeks
CONV ETH

CONV ETH

CONV ETH makes it possible to implement the characteristics of TECSYSTEM control units in the monitoring system ...