UART
Identify the actual interface of the selected device or module. References in this group do not all use native UART signalling.
Review the specification →GUILCOR · Digital sensing
Explore serial sensing references and electrical interfaces. This family includes SMBus, I²C and proprietary sensor protocols as well as RS232 and RS485; the reference name alone does not establish a UART connection.

SELECTION / YOUR APPLICATION
Identify the actual interface of the selected device or module. References in this group do not all use native UART signalling.
Review the specification →The equipment specifies RS232 electrical signalling and a documented application protocol. Keep pinout, framing and command requirements together.
Explore RS232 →The equipment specifies an RS485 network. Review the application protocol, topology, driver control and required physical-layer arrangement.
Explore RS485 →These links support a specification review. They do not establish interchangeable parts or availability of a complete assembly.
Interactive application guide
Choose the reference to see its actual communication path. Confirm the full part or module documentation before wiring the host.
Enable JavaScript to use this guide.
Operating principle
SPI uses a clock and chip selection with device-specific data framing. UART uses asynchronous frames; RS232 and RS485 describe electrical signalling. SMBus, I²C and proprietary timed protocols need their own host support.
Choose the sensing function first: local temperature, infrared object temperature, humidity or an external analogue sensor. Then verify the complete communication path, conversion timing and measurement conditions.
Reference comparison
| Reference | Selection focus | Reference characteristic |
|---|---|---|
| MLX90614 | Make the target fill the optical field of view. | SMBus with PWM option; not UART |
| MLX90615 | Distinguish the object channel from sensor ambient. | SMBus with PWM option; not UART |
| GY-906 | Identify the board before choosing wiring or a driver. | Confirm board supplier, revision and fitted IC marking |
| DHT11 | Track successful measurements separately from read attempts. | Temperature and relative humidity |
| DHT22 / AM2302 | Validate the checksum before using the two channels. | Timed single-data-line transfer; not UART |
| SHT75 | Plan migration across both hardware and firmware. | −40 to +123.8 °C; 0 to 100 % RH with operating-condition limits |
| SHT85 | Allow air access and evaluate the installed response. | −40 to +105 °C; humidity conditions must also be respected |
| RS232 | Budget the frame time before choosing a polling interval. | Electrical interface for serial communication |
| RS485 | Review topology, termination and driver control together. | Differential electrical interface; not a sensor model |
Wiring and integration
Separate the sensor protocol, UART framing and electrical transceiver. Identify the reference first, then choose the host peripheral, logic levels, wiring and application commands.
Match the electrical levels and the actual protocol at both ends. Confirm signal direction, grounding, pinout and any required transceiver. The interface name alone does not determine cable length, immunity or sensor accuracy.
Plan startup, conversion completion, timeout and recovery. Check integrity information where provided and retain the time of the last valid acquisition. Successful communication does not prove that the physical measurement has settled.
Acquisition sequence
Confirm the part, interface, supply and measurement mode.
Issue the device-specific command and satisfy its timing and power needs.
Read the correct registers, check CRC where provided and reject invalid or stale results.
Apply the correct decoder or compensation, units and application limits.
Measurement quality
Choose the error limit over the actual operating interval. Add installation and readout effects. Define any calibration and periodic verification required by the application; factory calibration does not establish a universal no-maintenance policy.
A sheath, potting material and mounting contact change how fast the sensing element follows the medium. Verify response in the intended flow and installation, rather than using conversion time as the finished-probe response.
Average dissipation depends on supply, conversion duty and surrounding electronics. Test the assembled probe at the intended reading rate. Do not assume a universal self-heating offset from the interface name.
Form factor library
Choose the shape and mounting for the measurement point. These are GUILCOR probe families and a design service; confirm the compatible element, dimensions, cable and complete assembly for the selected reference.
Frequently asked questions
No. Match the electrical levels, protocol, timing and commands for the actual reference. Similar connector shapes or wire counts do not establish compatibility.
No. The sensor, conversion circuit, calibration and installation determine the measurement performance. Specify these separately from the communication interface.
Send the reference and full ordering code, measured quantities, operating interval, error and response requirements, mounting drawing, cable and connector, host interface and quantity.
Technical sources
GUILCOR / YOUR ENQUIRY
Send the equipment interface documentation and network layout. A serial interface identifies a communication path, not the sensing technology or application protocol.
Send the component marking, equipment reference and any photographs or documents you have. These provide a starting point for identifying what must be confirmed.
The outline helps prepare your enquiry. Copying it does not send a request.
FOUR DETAILS THAT MOVE THE DISCUSSION FORWARD
Equipment model, electrical interface, transceiver or isolation, connector pinout, baud rate, framing, addressing and command or register documentation.
Measured quantities, required update interval, response timeout, accuracy requirements and how invalid or missing readings should be handled.
Cable lengths and topology, grounding and shielding, termination or biasing where required, installation conditions and connection access.
Sample and production quantities, target delivery, calibration or documentation needs, and the checks required before approval.